(818) 572-3769 hello@sunvireo.com Mon–Thu 9:30am–4pm · Fri to 3pm
About · Studio notes · Glendale, CA

A yard that survives August without a rescue plan.

Sun Vireo is a small design studio on Harvey Drive. We draw native planting plans for full-sun lots, and we draw them for the summer you will actually have.

  • Hillside homeowners
  • ADU yards
  • Small HOA frontages
A planting plan on trace paper with a scale ruler and small pots of native sage on a drafting table

01 — Why we draw

The month most plans get tested.

We kept getting called after the nursery trip.

Most of the yards we were asked to fix had the same history. A weekend at a nursery in April, a trunk full of plants that looked right in a one-gallon pot, and a south-facing lot that cooked them by August.

So we started drawing the plan first. Sun mapped by the hour, water sorted into zones, every plant counted and named in Latin so no one at the counter can swap it for something thirstier.

We do not install. That is on purpose. A plan that two or three contractors can price from the same sheet is more useful to you than a crew that marks its own homework.

02 — House rules

Four rules on every sheet.

None of these are clever. They are why the plans hold up.

Rule A

Draw to the sun, not the street

Photos at 10am, 1pm and 4pm decide the layout before curb appeal does. Reflected heat off a driveway moves a plant more than taste does.

Rule B

Group by thirst

Plants sharing a drip line share a water need. One hydrozone, one valve, one controller setting.

Rule C

Show it at maturity

Each plant is drawn at planting size and at full size. If the yard looks sparse in year one, the plan already said so.

Rule D

Keep what works

Healthy shrubs, a good oak, the unglamorous rosemary. We draw around what you already own before we add anything.

03 — The calendar of a job

From photos to a finished set.

A typical remote plan runs eight business days. On-site jobs run twelve. Here is how those days are spent.

  1. Day 0Photos and survey arrive

    Sent by email or dropped at the studio.

  2. Day 1–2Video walk of the lot

    Or a 90-minute site visit, with tape, soil probe and a note of where the afternoon heat sits.

  3. Day 3–6Drawing

    Base sheet, sun map, hydrozones, plant schedule.

  4. Day 7–8Check and issue

    Counts tallied twice. PDF set sent, with one revision round included in conversation.

A newly staked native planting bed with decomposed granite path in late-afternoon sun
Stakes and string line on planting day, set from the plan.

04 — Edges of the work

What we leave to others.

Knowing where the drawing stops saves everyone an awkward invoice.

  • Not oursInstallation

    Your contractor builds. We will stand in the yard for two hours on planting day ($160) and check spacing against the sheet.

  • Not oursEngineering

    If a slope needs a retaining wall or a soils report, we say so before we invoice, and refer you on.

  • Not oursPermit filing

    We format the set for HOA or city review and answer reviewer questions. The application stays with you.

Next sheet

Start with three photos.

Morning, midday, late afternoon. We reply within one business day, Mon–Thu 9:30am–4pm · Fri to 3pm. Packages start at $685.

Send us your lot